Veteran’s Administration (VA) Medical Center
Cardiac Catheterization Laboratory
West Roxbury, MA
After preparing a lengthy infrastructure study, MCM determined that the hospital could support a third cardiac catheterization lab. To prevent interruption to patients and staff and ensure effective infection control during construction, MCM proposed a creative and efficient solution: the team erected an exterior elevator to move equipment and contracting staff up to the construction site. As the result of a focused value engineering effort, MCM also succeeded in saving the client more than the fee paid to MCM.
Services provided: Infrastructure Study, Design and Construction Management
"Our project manager from MCM was extremely professional, accessible and responsive to any issues that developed. There was very little disruption in our schedule, allowing us to continue to care for our patients without negative impact."
- Martha Nyklel, R.N., West Roxbury Veteran’s Administration Medical Center